Januburu Aboriginal Engagement
PROCESS
-
Prior to design, a round table meeting sought
the custodians’ input
-
Continuous monthly meetings
-
Placement of a wide Environmental Cultural
Corridor and swale drainage through the
development (as derived from the 1997 Town
Planning for Aboriginal Culture project)
-
Determining the width of the ECC on site with
the custodians
-
Identifying tree clusters with the custodians
for further internal open space;
-
Placing road structures in response to
environmental conditions;
-
Confirming design outcomes with the
custodians’ planner
-
Finalising designs
-
Handing over title of neighbouring land
-
Offering contributions from sales of land